Terengganu
| + |
The Engineering, Procurement,
Construction & Commissioning for Gas Processing Plant 1 (GPP
1) & Export Terminal 1&2 (ET 1&2) Rejuvenation &
Revamp Project (In Consortium with Mitsubishi Heavy Industries Ltd.,
Japan), Kerteh, Terengganu |
| + |
The Engineering, Procurement
& Construction for Installation of New Balancing Tank |
| + |
Procurement, Construction and
Commissioning Service for Petronas Gas Processing Plant Nos. 2,
3 & 4, Ethane Extraction Improvement Project, Kerteh, Terengganu |
| + |
Off-skid Piping Prefabrication For Centralised Utilities
Facilities at Kerteh, Terengganu |
| + |
Steam Piping Prefabrication For Centralised Utilities
Facilities at Kerteh, Terengganu |
| + |
The Engineering, Procurement, Construction and Commissioning
of Second Effluent Underground Discharge Line for Trengganu Crude
Oil Terminal, Kerteh |
| + |
The Procurement and Construction of all Civil and
Foundation Work for Low Density Polyethylene (LDPE) Plant. Capacity
: 255,000 TPY. Major Work Quantities :
- Concrete : 16,000
- Rebar : 2,500
- Formwork : 33,000
- Drainage : 6,000
- Roadwork : 5
|
| + |
The Procurement, Construction
and Commissioning of Mechanical Erection, Piping Prefabrication
and Erection, Steel Structure Work, Insulation and Painting work
for Petronas/UCC Olefin Plant OSBL facilities. |
| + |
Civil Work for OSBL Facilities and Infrastructure
for Petronas/UCC Olefin Plant, Kerteh, Terengganu |
| + |
The Procurement, Construction
and Commissioning Assistance for the Mechanical Equipment Installation,
Structural Steel Erection, Carbon Steel/Stainless Steel/Alloyed
Steel Piping Prefabrication and Erection Work for Petronas Ammonia/Syngas
Complex, Kerteh
Major Work Quanitities :
- Fabrication and Erection of 250,000 diam-inch of piping (Piping
materials: 2.25% Cr 1% Mo, 1.25% Cr 0.5% Mo, S316L & A333
- Erection of 2100 MT Structural Steel
- Installation of 3500 MT of Mechanical Equipment
|
| + |
The Procurement, Construction and Commissioning of
the Mechanical Erection and Piping Insulation & Painting Works
for Poly Vinyl Chloride (PVC) Project, Kerteh, Terengganu. Major
Work Quantities :
- Piping 100,000 dia-inch
- Mechanical Equipment 1100 MT
- Structural Steel 500 MT
- Cold Insulation 500m2
- Hot Insulation 1000m2
|
| + |
Supply, Fabrication and Delivery of Solution Storage
Tank work for Petronas Ammonia / Syngas Complex, Kerteh, Terengganu |
| + |
The Engineering, Supply, Erection and Commissioning
of Tank Farm for Centralised Utility Facilities for Petronas Gas Bhd.,
Kerteh, Malaysia.
- Raw Water Tank (4 units) : 50m
- Demin Water Tank (2 units) : 24m
- Potable Water Tank (2 units) : 8m Dia
- Condensate Water Tank (2 units) : 25.5m
|
| + |
The Engineering, Procurement,
Fabrication and Erection of 1,800 MT of piperack and building structural
steel for Petronas Aromatics, Kerteh, Malaysia (sub-contract from
Toyo Engineering Corporation) |
| + |
The Supply, Construction and
Erection of all precast piperack for Petronas Aromatics Plant, for
Toyo Engineering Corporation, Kerteh, Malaysia. Total Nos. : 1200
pcs |
| + |
Procurement and Construction of
Civil Work for Processing Units Nos. 1, 2, 3, 4 & 5 for Petronas
Aromatics Plant, Kerteh, Terengganu, Malaysia
(In joint venture with Nam Fatt Construction Sdn Bhd)
Major Work Quantities :
- Excavation : 60,000 m3
- Concrete : 16,000 m3
- Rebar : 1,200 MT
- Formwork : 30,000 m3
- Fireproofing : 600 m3
- Roadwork : 600 m3
|
| + |
The Engineering, Procurement
and Construction of Workshop for Petronas Aromatics Plant, Kerteh,
Terengganu for Toyo Engineering & Construction Sdn Bhd, Malaysia. |
| + |
The Procurement and Construction
of the Main Administration Office Complex for Vinyl Chloride Monomer
Plant, for Petronas Gas Sdn Bhd, Kerteh, Malaysia. |
| + |
The Procurement, Installation
and Commissioning of Feed Liquid Flow Controllers at Petronas Gas
Processing Plant No. 2, Kerteh, Terengganu, Malaysia |
| + |
The Procurement, Construction
& Commissioning Assistance for The Replacement Works of Cold
Box T3-401 at Gas Processing Plant No 3, Kerteh, Terengganu.The
supply, construction and erection work for all precast piperack
for Petronas Gas Processing Plant 5&6 for Daelim Engineering
& Industrial Co. Ltd, Malaysia |
| + |
The procurement, construction
of mechanical equipment and process piping, including commissioning
assistance for Polyethylene Malaysia Sdn Bhd (200,000 MTPY) Kerteh,
Malaysia. |
| + |
The supply of labour and equipment
to assist pre-commissioning activities for Polyethylene Malaysia
Sdn Bhd, Kerteh, Malaysia |
| + |
The supply of labour, equipment
& consumable to carry out equipment erection for Polyethylene
Malaysia Sdn Bhd, Kerteh, Terengganu (In association with Walter
Wright Mammoet) |
| + |
The supply of labour, equipment
& consumable to fabricate and install above ground process piping
work for Polyethylene Malaysia Sdn Bhd |
| + |
The supply and constructtion
of technical service laboratory for Polyethylene Malaysia Sdn Bhd,
Kerteh, Terengganu, Malaysia |
| + |
To supply and construct control
building and electrical sub-station for Polyethylene Malaysia Sdn
Bhd, Kerteh, Terengganu, Malaysia |
| + |
To supply and construct equipment
foundation for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu
(civil work Lot 2), Malaysia
Major scope of work :
- Vertical equipment : 26 nos.
- Pumps/Ventilators : 33 nos.
- Horizontal vessels and heat exchangers : 4 nos.
- Structure foundation : 26 nos.
- Miscellaneous foundation : 26 nos.
- Elevated homogenisation : 1 no.
- Silo foundation
- Total excavation : 2,000 m3
- Formwork : 7,800 m2
- Steel bar : 223 MT
- Concrete : 2,104 m3
|
| + |
The supply of labour, equipment and consumables to
fabricate and install all hot and cold tie-in works and global metering
for Lawit project at Esso Onshore Slugcatcher and Terengganu Crude
Oil Terminal for Esso Production (M) Inc., Kerteh, Malaysia |
| + |
The civil, mechanical and electrical upgrading work
for Esso Onshore Slugcatcher Facilities for Esso Production (M) Inc.,
Kerteh, Malaysia |
| + |
The upgrading work for the high and low flare system
for Terengganu Crude Oil Terminal, (Emergency shut down work) for
Esso Production (M) Inc., Kerteh, Malaysia. |
| + |
The installation of all carbon, alloyed and stainless
steel piping, erection of process equipment insulation and painting
works for the Kuantan Gas Compressor and Paka Metering Station,
for Petronas Gas Sdn Bhd, Malaysia
Major work quantities :
- Equipment installation Total weight = 504 MT
- Major process equipment
- Gas coolers x 3 units (90,000 Kg)
- Gas compressors (75,000 Kg)
- Gas turbine (102,000 Kg)
- Filters/Separators (163,400 Kg)
- Air receiver (22,000 Kg)
- Gas separators (20,600 Kg)
- Mechanical piping installation
(Total = 60,000 diam-inch)
- High pressure gas piping system (30,000 diam-inch)
- Fuel, staring. Power and utility gas system (10,000 diam-inch)
- Compressed Air system (10,000 diam-inch)
- Other station piping (10,000 diam-inch)
- Insulation for Gas Piping System : 1,200 m2
|
| + |
The installation of all u/g pipes,
incl. pipe trench excavation, backfilling, anti corrosion wrapping
and hydrotesting at Gas Processing Plant Expansion Project, Kerteh,
Terengganu |
| + |
The engineering, procurement,
erection of 9 nos. of internally lined and unlined cone roof storage
tanks for Tioxide Chemicals Plant at Kemaman, Terengganu |
| + |
Prefabrication and installation
of 3" to 48" pipe spools and piping system on elevated
piperack to tie-in to new floating roof tank T-446, including all
electrical and instrumentation work at Terengganu Crude Oil Terminal,
Kerteh |
| + |
The construction of roads and
drain and buildings for Compressor Booster Station at Terengganu
Crude Oil Terminal for Esso Production (M) Inc., Kertih, Malaysia. |