Pahang
| + |
Civil and reinforced concrete
structure work for Kuantan Waste Water Treatment & Debottleneck
for BP/Amoco No. 1 PTA, Plant, Kuantan |
| + |
The piping installation works
to the PPD Facility and West Extension to existing Manufacturing
Building for Cryovac (Malaysia) Sdn Bhd, Kuantan, Pahang. |
| + |
The Procurement, Construction and
Commissioning Assistance for the Mechanical Equipment Installation,
Piping Installation, Painting, Hot and Cold Insulation Work for
Propane Dehydrogenation Complex (Petronas MTBE Plant Extension),
Kuantan, Malaysia
- Prefabrication and Installation of 300,000 diam-inch of piping
- Structure Steel 1,600 MT
- Cold Insulation 12,500 m2
- Hot Insulation 2,000 m2
|
| + |
The provision of site supervision
and labour for the installation of heavy process equipment (total
weight: 3500 MT), Mechanical/Piping and other Mechanical Works for
Petronas/BASF 160,000 MTPY Acrylic Acid Complex, Kuantan, Pahang,
Malaysia.
Major Process Equipment :
- Reactor R-2100/R-2000 (2 x 234 mT, 7.2m diam x 3.2mH)
- Reactor R-2150/R-2250 (2 x 249 mT, 7.2m diam x 3.2mH)
- Absorption Tower T3100 (215 mT, 6.2m diam x 51.3 mH)
- Finishing Tower T3300 (174 mT, 4.2m diam x 40.2 mH)
- Waste Heat System Boiler for 10 MV Steam Turbine (150 MT)
|
| + |
The Procurement, Construction and
Commissioning of Mobil Kuantan Terminal Expansion Project, Pahang
Darul Makmur. |
| + |
The piping, mechanical, steel structures
& painting works for Amoco No. 1 PTA Plant Debottlenecking Project
for Amoco Chemical (M) Sdn Bhd., Kuantan, Malaysia. |
| + |
Additional tankage & truck
loading bay extension work for Mobil Kuantan Oil Terminal for Mobil
Oil Malaysia Sdn Bhd, Malaysia. |
| + |
The mechanical construction and
commissioning of equipment erection, piping, (C.S./S.S./GRE/ UPVC)
insulation and painting work for WR Grace Packaging Plant, Kuantan,
Malaysia |
| + |
The supply of labour, equipment
& consumable to mechanical and electrical work for Amoco No
1 PTA Plant, Gebeng Industrial Estate, Pahang |
| + |
The supply of labour, equipment
& consumable to fabricate and lay all mechanical equipment installation,
aboveground and underground piping work for Amoco No.1 PTA Plant,
Gebeng Industrial Estate, Pahang, Malaysia.
Major work quantities :
- Equipment installation (Total Weight = 1,886MT)
- Major Process Equipment :Oxidation Reactors (2 x 120 MT)
- TA First Crystalliser (1 x 60MT)
- PTA First Crystalliser (1 x 155MT)
- PTA Second Crystalliser (1 x 100MT)
- PTA Third Crystalliser (1 x 65MT)
- PTA Fourth Crystalliser (1 x 35MT)
- PTA Fifth Crystalliser (1 x 20MT)
- Solvent Dehydration Tower (1 x 60MT, 316L/317L)
- Process Air Compressor (2 x 118MT)
- Crude TA Dryer (1 x 110MT)
- PTA Dryer (1 x 180MT)
- Hot Oil Heater (2 x 272MT)
- Prefabrication and installation of 304,800 Diam-inch (3000MT)
piping : (Piping Material: CiS, A-304L, A-316L, 1.25% Cr 0.5%
Mo, Titanium, Hastelloy C, Uranus B-6)
- Structural Steel : 3,100 MT
- Electrical : Cabling 300,000M
- Instrumentation : Cabling 170,000M, Instruments 6,500 Nos.
- Insulation : 50,000 m2
|
| + |
The supply & construction of
all civil and precast concrete process structure / piperack, equipment,
foundation stainless steel lined ditches / pit etc in ISBL for Amoco
No.1, PTA Plant, Gebeng Industrial Estate, Pahang, Malaysia. |
| + |
The procurement, construction,
testing and commissioning of Bulk Storage Facilities for Mobil Kuantan
Terminal for Mobil Oil Malaysia Sdn Bhd., Malaysia
Major scope of work :
- Site clearing and sand filling of 4.5 acres site
- Main office building, warehouse, lorry filling shed, pumps and
valve manifold shed
- Gasoline tank (2 units) : 24.4m Diam x 9 mH
- Diesel tank (2 units) : 24.4m Diam x 9 mH
- Fire water tank (1 unit) :
18.3m Diam x 9 mH
- Fire hydrant and foam system
- Product piping and 10 inch diam 1.6Km cargo pipeline
- Electrical and instrumentation systemInfrastructure work
|
| + |
The construction of 3 nos. 35' dia. x 30'H M.S. Storage
tank at Dovechem Terminals Kuantan. |
[ back
]
|
 |