| + |
Site Grading/Foundation Piling
for new Philip Morris Cigarette Facility Expansion Project, Seremban,
Malaysia. |
| + |
The Engineering, Procurement,
Construction, Commissioning and Handover of the Petronas Onshore
Gas Terminal, for Petronas Carigali Sdn Bhd, Malaysia |
| + |
Central Plant Demolition, Piling
Foundation and Building Works for new cigarette processing facilities
expansion project. |
| + |
The Engineering, Procurement,
Construction and Commissioning of Jet A-1 Drain Down Tank at Forward
Fuel Base Kuala Lumpur International Airport Aviation Terminal,
Sepang, Malaysia |
| + |
The Engineering, Procurement,
Construction and Commissioning of Fuel Oil and Potable Water Storage
Tanks for Powertron Power Station, for Peremba-Kentz Engineering
Sdn Bhd, Sabah, Malaysia. |
| + |
The Design, Procurement, Construction
and Commissioning of Bulk Storage Depot for Petronas Cambodia Co.
Ltd., Phnom Penh Cambodia. (JV with Technip Far East Sdn Bhd) |
| + |
The Design, Procurement, Construction
and Commissioning of Caltex Sihanoukville Bulk Storage Depot for
Caltex Services Cambodia Ltd, Cambodia. |
| + |
The Procurement, Construction
and Commissioning of Mechanical / Piping Works for Kuala Lumpur
International Airport Aviation Terminal, Malaysia. |
| + |
The Engineering, Procurement,
Construction of Main Office Complex for Petronas Kuala Lumpur International
Airport Aviation Fuel Terminal, Malaysia. |
| + |
The Procurement and Construction
of Civil Works and Structural Steel Shelters for Kuala Lumpur International
Airport for Petronas/Malaysia Airline System/Malaysia Airport Bhd. |
| + |
The Design, Procurement, Construction
and Commissioning of 8 Nos. of Jet Fuel Storage Tanks for Petronas
Kuala Lumpur International Airport Aviation Fuel Terminal, Malaysia |
| + |
Bored Piling Work and Earthwork
for Cabot Unit 3 Project, Port Dickson, Malaysia. |
| + |
Renew piping for pumping station
for Petronas Dagangan Aviation Depot at Subang International Airport,
Selangor |
| + |
Site Grading / Foundation Piling
for Philip Morris Cigarette Facility Expansion Project, Seremban,
Malaysia. |
| + |
The Earthwork and related civil
work for proposed Fleet Management Terminal for Klang Valley Distribution
Terminal for Shell/Petronas J.V,? |
| + |
The Procurement, Construction
& Commissioning Assistance for The Replacement Works of Cold
Box T3-401 at Gas Processing Plant No 3, Kerteh, Terengganu.? |
| + |
The Procurement, Construction
and Commissioning of additional fuel hydrant line at Bayan Lepas
International Airport, for Petronas Dagangan Berhad, Malaysia. |
| + |
The Design, Procurement, Construction
and Commissioning of Field Erected Tanks for Sultan Salahuddin Abd
Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad,
Malaysia. |
| + |
The Procurement, Construction
and Commissioning of Mobil Kuantan Terminal Expansion Project, Pahang
Darul Makmur.? |
| + |
The piping, mechanical, steel
structures & painting works for Amoco No. 1 PTA Plant Debottlenecking
Project for Amoco Chemical (M) Sdn Bhd., Kuantan, Malaysia. |
| + |
Engineering,?Procurement, Construction and Commissioning
of Klang Valley Distribution Terminal, Selangor (Consortium of :
Sumatec - Nam Fatt - Babcock K-W) |
| + |
The supply, construction and
erection work for all precast piperack for Petronas Gas Processing
Plant 5&6 for Daelim Engineering & Industrial Co. Ltd, Malaysia |
| + |
The engineering, procurement
& commissioning of storage tanks for Phnom Penh Power Station,
Cambodia. |
| + |
The supply and Construction of
Fibre Optic Cable manufacturing factory at Bandar Baru Bangi, Selangor
for Uniphone Cables Sdn Bhd, Malaysia.? |
| + |
The supply and Construction of
Aluminium Rod Manufacturing Factory at Bandar Baru Bangi, Selangor
for Uniphone Cables Sdn Bhd, Malaysia. |
| + |
Additional tankage & truck
loading bay extension work for Mobil Kuantan Oil Terminal for Mobil
Oil Malaysia Sdn Bhd, Malaysia.? |
| + |
The Procurement and Fabrication
of 2 units of 3300 IG AVGAS tanks for PDB Airport Depot, Langkawi. |
| + |
The design, procurement, construction
and commissioning of Field Erected Tanks for Sultan Salahuddin Abd
Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad,
Malaysia. |
| + |
The design, procurement, construction
and commissioning of Total Cambodge
Tank Farm for Total Cambodia Ltd., Phonm Penh, Cambodia. |
| + |
Procurement, construction &
commissioning of 1 Jet-A1 fuel storage tank complete with pipeworks
at Petronas Dagangan's Bulk Depot, Langkawi, Malaysia. |
| + |
The mechanical construction and
commissioning of equipment erection, piping, (C.S./S.S./GRE/ UPVC)
insulation and painting work for WR Grace Packaging Plant, Kuantan,
Malaysia |
| + |
The supply and extension and
addition of 1 no. factory and 2 nos. warehouse to existing factory
including ancillary and external works for Hume Industries (M) Bhd.,
Ipoh, Malaysia. |
| + |
The engineering, procurement,
construction and commmissioning of storage tanks for W.R.Grace,
Malaysia? |
| + |
Procurement, construction, testing
and commissioning of two nos. of fuel oil tanks for Petronas Sepangar
Bay Depot, Sabah, Malaysia. |