







|

    
Johor
| + |
The piping and equipment insulation
works for SBR Latex Production Plant, Kluang, Johore |
| + |
The detail design, supply, fabrication, installation
and testing of piping and mechanical works for SBR Latex Production
Plant, Kluang, Johore |
| + |
The Procurement, Construction
and Commissioning of additional fuel hydrant line at Bayan Lepas
International Airport, for Petronas Dagangan Berhad, Malaysia. |
| + |
The Civil / building / structural work for Air Separation
Plant for Malaysian Oxygen Berhad at Pasir Gudang, Johore, Malaysia |
| + |
The fabrication, erection, testing and commissioning
of aboveground process piping and mechanical process equipment installation
for Naptha Cracking Plant (230,000 MTPY) for Titan Petrochemicals
(M) Sdn Bhd., Johore, Malaysia
Major work quantities :
- Prefabrication and erection of 150,000 diam-inch of pipework
(Piping material : A53GrB, A333 GrB, A312-TP304, A312-TP316, A335GrP11,A333Gr3)
- Hydrotest (150 test packages)
- Pre-commissioning assistance
|
| + |
The procurement and installation of all carbon steel,
stainless steel copper and aluminium piping work, equipment installation,
painting, cold and hot insulation for MOX Pasir Gudang Air Separation
Plant for Malaysia Oxygen Berhad, Malaysia |
| + |
The engineering, procurement and installation of
hydrogen and nitrogen gas distribution pipeline from Malaysia Oxygen
Bhd Plant to Pasir Gudang Industrial Estate for Malaysian Oxygen
Berhad.
- Hydrogen Pipeline : 6" x 1.8 Km
- Nitrogen Pipeline : 8" x 3.2 Km
- Road Boring : 600 mm Diam x 12 length (5 locations)
|
| + |
The installation of refractory work for 4 units of
UCS cracking furnance for Naptha Cracking Plant, Pasir Gudang, Johore |
| + |
The civil / building and structural construction of
the proposed hydrogen Plant at Pasir Gudang Johore Darul Takzim for
M.O.X Berhad |
| + |
Site clearing, earthwork, steel structure for LPG
Bottling Plant Hall, LLN Sub-station, Gas Compressor Shed, drainage,
roadwork, fencing and associated work for LPG Storage cum Bottling
Plant for Shell Malaysia Trading Sdn Bhd, Pasir Gudang, Malaysia. |
| + |
The construction of the proposed rebuilding Esso Service
Station on Lot T.L.O 41111 at Jalan Harimau / Jalan Harimau Tarum,
Taman Century, Johore |
| + |
The construction of 9 nos. of bulk storage tanks and
all associated piping works, including 1.6 km three 10-inch cargo
lines from the Jetty for Shell Pasir Gudang Depot, for Shell Malaysia
Trading Sdn Bhd, Malaysia. |
| + |
Supply, delivery, installation, testing and commissioning
of first manholes, sewer pipe and installation for Hostel III, IV,
V at University Technology of Malaysia, Skudai, Johore |
[ back
]
|
 |