Projects List

  Upgrading Works on Fuel Oil Storage on Funadhoo Island, Republic of Maldives
  The Engineering, Procurement, Construction & Commissioning for Gas Processing Plant 1 (GPP 1) & Export Terminal 1&2 (ET 1&2) Rejuvenation & Revamp Project (In Consortium with Mitsubishi Heavy Industries Ltd., Japan), Kerteh, Terengganu
  MLNG Rejuvenation & MLNG/MLNG2 Revamp (MRR) Project Bintulu, Sarawak - Module 2 & 3 (JV with Astel Peineger/Kumus)
  Main Construction Package, Ammonia and Urea Plant Revamp Project, Bintulu, Sarawak, Malaysia (JV with PDIL)
Design, Procurement and Management of Building and Infrastructure Works for housing facilities for Armed Forces, Sungai Besi, Kuala Lumpur, Malaysia
The Engineering, Procurement & Construction for Installation of New Balancing Tank
MLNG Rejuvenation & MLNG/MLNG Dua Revamp (MRR) Project, Bintulu, Malaysia - Offsites & Common Facilities Painting
  Provision of supervision, skilled labor, tools, equipment and consumables to assemble Blocks 36 and 37 of the DSS20 Semi-Submersible (H103), Baku, Azerbaijan
  Nam Con Son Condensate Storage Tank Project, Vungtau, Republic of Vietnam
  MLNG Rejuvenation & MLNG/MLNG Dua Revamp (MRR) Project, Bintulu, Malaysia - Module 1 Painting Work
  Procurement, Construction and Commissioning Service for Petronas Gas Processing Plant Nos. 2, 3 & 4, Ethane Extraction Improvement Project, Kerteh, Terengganu 
  Technical Building Works for Pump Station No 2, Dompta (PS2) and Pump Station No 3, Belabo (PS3) for Tchad-Cameroon Pipeline Project, Republic of Cameroon 
  Provision of Engineerig and Installation Service for the Mechanical Erection Works at Pump Station 2 (PS2) for the Tchad-Cameroon Pipeline Project, Dompta, Republic of Cameroon
  Provision of supervision, skilled labour, tool, equipment and consumables to fabricate, assemble and erect steel structure on Living Quarters and E-generator Block to Upper Hull, Baku, Azerbaijan
  The Procurement, Construction and Commissioning of New Desalination Plant for Malaysian LNG Complex, Bintulu, Malaysia
  Project Management Service for the Ampa-Fairley Onshore Compression and Slugcatcher Facilities for Brunei LNG Complex, Brunei
  The piping and equipment insulation works for SBR Latex Production Plant, Kluang, Johore
  Off-skid Piping Prefabrication For Centralised Utilities Facilities at Kerteh, Terengganu
  Steam Piping Prefabrication For Centralised Utilities Facilities at Kerteh, Terengganu
  The detail design, supply, fabrication, installation and testing of piping and mechanical works for SBR Latex Production Plant, Kluang, Johore
  Civil and reinforced concrete structure work for Kuantan Waste Water Treatment & Debottleneck for BP/Amoco No. 1 PTA, Plant, Kuantan
  The piping installation works to the PPD Facility and West Extension to existing Manufacturing Building for Cryovac (Malaysia) Sdn Bhd, Kuantan, Pahang 
  The procurement, construction and commissioning of Unity Field Water Injection Facilities, Phase 1, for Muglad Basin Oil Development, Republic of Sudan  
The Engineering, Procurement, Construction and Commissioning of Second Effluent Underground Discharge Line for Trengganu Crude Oil Terminal, Kerteh
The Procurement and Construction of all Civil and Foundation Work for Low Density Polyethylene (LDPE) Plant. Capacity : 255,000 TPY.
Major Work Quantities :
  Concrete : 16,000
  Rebar : 2,500
  Formwork : 33,000
  Drainage : 6,000
  Roadwork : 5
The Procurement, Construction and Commissioning of Mechanical Erection, Piping Prefabrication and Erection, Steel Structure Work, Insulation and Painting work for Petronas/UCC Olefin Plant OSBL facilities.
The Deign, Procurement, Cosntruction of Main Office Building, Electrical MCC Building, Sub-station, Control/Lab Building and Guard House for a Crystex (insoluble sulphur) Plant for Flexsys Chemicals Sdn Bhd.
The Design, Procurement, Construction of Warehouse, Schedule Waste Storage and Maintenance / Spare Parts Buildings for a Crystex (insoluble sulphur) Plant for Flexsys Chemicals Sdn Bhd.
The Engineering, Procurement, Construction, Commissioning and Handover of 2 Nos. of The Garaad New Wells and 10.8 Km of Underground 8" Diameter Flowline and 1 Km of Underground 6" Diameter Flowline, for Field Surface Facilities, Muglad Basin Oil Developme
The Engineering, Procurement, Construction, Commissioning and Handover of 7 Nos. of The Unity New Wells and 30 Km of Underground 6" Diameter Flowline, for Field Surface Facilities (Phase 2) for Muglad Basin Oil Development, Republic of Sudan 
Civil Work for OSBL Facilities and Infrastructure for Petronas/UCC Olefin Plant, Kerteh, Terengganu
The Procurement, Construction and Commissioning Assistance for the Mechanical Equipment Installation, Piping Installation, Painting, Hot and Cold Insulation Work for Propane Dehydrogenation Complex (Petronas MTBE Plant Extension), Kuantan, Malaysia
Prefabrication and Installation of 300,000 diam-inch of piping
Structure Steel 1,600 MT
Cold Insulation 12,500 m2
Hot Insulation 2,000 m2
The Design, Procurement, Construction & Commissioning of Jet Fuel Storage Expansion and Upgrading of Male' International Airport, Republic of Maldives
The Procurement, Construction and Commissioning Assistance for the Mechanical Equipment Installation, Structural Steel Erection, Carbon Steel/Stainless Steel/Alloyed Steel Piping Prefabrication and Erection Work for Petronas Ammonia/Syngas Complex, Kerteh
Major Work Quanitities :
    Fabrication and Erection of 250,000 diam-inch of piping (Piping materials: 2.25% Cr 1% Mo, 1.25% Cr 0.5% Mo, S316L & A333
    Erection of 2100 MT Structural Steel
    Installation of 3500 MT of Mechanical Equipment
The engineering, procurement and construction of shore protection works at Bulk Storage Depot at Sombrong Keinsway, Thom, Phnom Penh.
The Procurement, Construction and Commissioning of the Mechanical Erection and Piping Insulation & Painting Works for Poly Vinyl Chloride (PVC) Project, Kerteh, Terengganu.
Major Work Quantities :
    Piping 100,000 dia-inch
    Mechanical Equipment 1100 MT
    Structural Steel 500 MT
    Cold Insulation 500m2
    Hot Insulation 1000m2
The provision of site supervision and labour for the installation of heavy process equipment (total weight: 3500 MT), Mechanical/Piping and other Mechanical Works for Petronas/BASF 160,000 MTPY Acrylic Acid Complex, Kuantan, Pahang, Malaysia.
Major Process Equipment :
    Reactor R-2100/R-2000 (2 x 234 mT, 7.2m diam x 3.2mH)
    Reactor R-2150/R-2250 (2 x 249 mT, 7.2m diam x 3.2mH)
    Absorption Tower T3100 (215 mT, 6.2m diam x 51.3 mH)
    Finishing Tower T3300 (174 mT, 4.2m diam x 40.2 mH)
    Waste Heat System Boiler for 10 MV Steam Turbine (150 MT)
Supply,  Fabrication and Delivery of Solution Storage Tank work for Petronas Ammonia / Syngas Complex, Kerteh, Terengganu 
The fabrication and installation of piping and erection of crude oil pumping stations Nos. 1, 3 and 5 for Muglad Basin Oil Development, Republic of Sudan
The Engineering, Procurement, Construction, Commissioning and Handover of Field Surface Facilities, Phase 1, for Muglad Basin Oil Development for Greater Nile Petroleum Operating Co.Ltd., Republic of Sudan.
Scope of work :
      Construction and installation of flowlines from wells located at Unity and EI Toor up to the manifold at respective field production facilities (FPF)
      Installation of a 3.3KV overhead electrical power distribution from the field production facilities (FPF) up to respective field surface facilities (FSF) location.
      Equipment installation and ancillary piping work
      Associated electrical work at field surface facilities (FSF)
      Control and shutdown system
      Condensate metering system
      Chemical injection system
      Pig launching and receiving facilities to the flowline
      Utility and safety systems
      Roads, drainage, fencing and other civil work
      Radio link data communication system
Total No. of wells : 43
Crude Oil Piggable Pipelines : 4" : 40
Crude Oil Piggable Pipelines : 6" : 17
Crude Oil Piggable Pipelines : 8" : 5
Crude Oil Piggable Pipelines : 12" : 3
The Engineering, Supply, Erection and Commissioning of Tank Farm for Centralised  Utility Facilities for Petronas Gas Bhd., Kerteh, Malaysia.
Raw Water Tank (4 units) : 50m
Demin Water Tank (2 units) : 24m
Potable Water Tank (2 units) : 8m Dia
Condensate Water Tank (2 units) : 25.5m
The Engineering, Procurement, Fabrication and Erection of 1,800 MT of piperack and building structural steel for Petronas Aromatics, Kerteh, Malaysia (sub-contract from Toyo Engineering Corporation)
The Supply, Construction and Erection of all precast piperack for Petronas Aromatics Plant, for Toyo Engineering Corporation, Kerteh, Malaysia. Total Nos. : 1200 pcs
Procurement and Construction of Civil Work for Processing Units Nos. 1, 2, 3, 4 & 5 for Petronas Aromatics Plant, Kerteh, Terengganu, Malaysia (In joint venture with Nam Fatt Construction Sdn Bhd)
Major Work Quantities :
      Excavation : 60,000 m3
      Concrete : 16,000 m3
      Rebar : 1,200 MT
      Formwork : 30,000 m3
      Fireproofing  : 600 m3
      Roadwork  : 600 m3 
The Engineering, Procurement and Construction of Workshop for Petronas Aromatics Plant, Kerteh, Terengganu for Toyo Engineering & Construction Sdn Bhd, Malaysia.
The Procurement and Construction of the Main Administration Office Complex for Vinyl Chloride Monomer Plant, for Petronas Gas Sdn Bhd, Kerteh, Malaysia.
The Procurement, Installation and Commissioning of Feed Liquid Flow Controllers at Petronas Gas Processing Plant No. 2, Kerteh, Terengganu, Malaysia
The Procurement, Construction and Commissioning of Petronas Second Refinery Sewer and Effluent Treatment System Modification Work for Petronas Penapisan Melaka Sdn Bhd., Malacca, Malaysia.
The civil, building, HVAC, electrical and fire-fighting protection and other mechanical works for Motor Vehicle Spare Parts Manufacturing Facilities, Banting, Selangor Darul Ehsan, for Kayaba (M) sdn Bhd, Malaysia.
The Mechanical/Piping Work for Make Pack and Central Plant for Philip Morris new cigarette processing facilities expansion project, Seremban, Malaysia.
Site Grading/Foundation Piling for new Philip Morris Cigarette Facility Expansion Project, Seremban, Malaysia.
The Engineering, Procurement, Construction, Commissioning and Handover of the Petronas Onshore Gas Terminal, for Petronas Carigali Sdn Bhd, Malaysia
Major scope of work :
     Gas / condensate receiving facilities (slugcather)
     Bypass facilities (bypass vessel when slugcather is offline)
     2 x 100% Gas scrubbing facilities ( to separate condensate from gas)
     1 x 100% condensate stabilization train and condensate storage tanks
    Gas & condensate metering system
    High and low flare system and blowdown system
     AOC / COC drainage system (GRE pipes)
     Wastewater treatment system (IGF/CPI/CDF)
     Main office building/workshop control room / MCC room truck loading shed
     Electrical supply and distribution system (Gas Generator / Diesel Generator / MCC & switch)
     DCS system
     UPS system
     Alarm & ESD system
     HVAC system
     Public address & alarm system
     Fuel gas system
     Diesel storage tank & diesel fuel transfer system
     Instrument & utility air system
     Firewater distribution system
     Service water distribution system
     Precommissioning and commissioning
Central Plant Demolition, Piling Foundation and Building Works for new cigarette processing facilities expansion project.
The Engineering, Procurement, Construction and Commissioning of Jet A-1 Drain Down Tank at Forward Fuel Base Kuala Lumpur International Airport Aviation Terminal, Sepang, Malaysia
The Engineering, Procurement, Construction and Commissioning of Fuel Oil and Potable Water Storage Tanks for Powertron Power Station, for Peremba-Kentz Engineering Sdn Bhd, Sabah, Malaysia.
The Design, Procurement, Construction and Commissioning of Bulk Storage Depot for Petronas Cambodia Co. Ltd., Phnom Penh Cambodia. (JV with Technip Far East Sdn Bhd)
Major Scope of Work :
Gasoline Tank : 16m Dia
Super Gasoline Tank : 16m Dia
Diesel : 18.3m
The Design, Procurement, Construction and Commissioning of Caltex Sihanoukville Bulk Storage Depot for Caltex Services Cambodia Ltd, Cambodia.
Major Scope of Work :
MOGAS Tank (92R) : 17m Diam x
MOGAS Tank (83R) : 17m Diam x
Diesel Tank : 18.4m Diam x
The Procurement, Construction and Commissioning of Mechanical / Piping Works for Kuala Lumpur International Airport Aviation Terminal, Malaysia.
The Engineering, Procurement, Construction of Main Office Complex for Petronas Kuala Lumpur International Airport Aviation Fuel Terminal, Malaysia.
The Procurement and Construction of Civil Works and Structural Steel Shelters for Kuala Lumpur International Airport for Petronas/Malaysia Airline System/Malaysia Airport Bhd.
The Design, Procurement, Construction and Commissioning of 8 Nos. of Jet Fuel Storage Tanks for Petronas Kuala Lumpur International Airport Aviation Fuel Terminal, Malaysia
Scope of Work :
Jet A-1 Tank:  8 nos. 31.5m Diam x 19.0mH (14,000 cum)
Bored Piling Work and Earthwork for Cabot Unit 3 Project, Port Dickson, Malaysia.
Renew piping for pumping station for Petronas Dagangan Aviation Depot at Subang International Airport, Selangor
Site Grading / Foundation Piling for Philip Morris Cigarette Facility Expansion Project, Seremban, Malaysia.
The Earthwork and related civil work for proposed Fleet Management Terminal for Klang Valley Distribution Terminal for Shell/Petronas J.V, 
The Procurement, Construction & Commissioning Assistance for The Replacement Works of Cold Box T3-401 at Gas Processing Plant No 3, Kerteh, Terengganu. 
The Procurement, Construction and Commissioning of additional fuel hydrant line at Bayan Lepas International Airport, for Petronas Dagangan Berhad, Malaysia.
The Design, Procurement, Construction and Commissioning of Field Erected Tanks for Sultan Salahuddin Abd Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad, Malaysia.
The Procurement, Construction and Commissioning of Mobil Kuantan Terminal Expansion Project, Pahang Darul Makmur. 
The piping, mechanical, steel structures & painting works for Amoco No. 1 PTA Plant Debottlenecking Project for Amoco Chemical (M) Sdn Bhd., Kuantan, Malaysia.
Engineering,  Procurement, Construction and Commissioning of Klang Valley Distribution Terminal, Selangor (Consortium of : Sumatec - Nam Fatt - Babcock K-W)
The detailed scope of work is as follows :
     Site grading / earth work / rock blasting
     Surface water / AOC / COC Drainage system
     Tank foundation / bund wall
     Main office building 
     Warehouse
     Driver shed
     Tank truck loading shed
     Electrical sub-station
     Inspection / Guard House
     Elevated piperack
     10  x  15,000 cum cone roof product storage tank
      2   x   9,000 cum cone roof water tank
      4   x   1,000 cum cone roof additive tank
      3   x   1,500 cum cone roof interface tank
      Inter tank piping system
      Tank truck loading with additive injective facilities
      Fire hydrant and foam system
      Fire detection and alarm system
      Tank truck automation system
      Emergency shut down system
      Public address system
      CCTV
      Power supply and distribution
      UPS system
      Earthing & bonding
      Telephone system
      Pre-commissioning and commissioning
      Handover / Documentation
The supply, construction and erection work for all precast piperack for Petronas Gas Processing Plant 5&6 for Daelim Engineering & Industrial Co. Ltd, Malaysia
     Total Nos. : 1,300 pcs
The engineering, procurement & commissioning of storage tanks for Phnom Penh Power Station, Cambodia.
  The supply and Construction of Fibre Optic Cable manufacturing factory at Bandar Baru Bangi, Selangor for Uniphone Cables Sdn Bhd, Malaysia. 
  The supply and Construction of Aluminium Rod Manufacturing Factory at Bandar Baru Bangi, Selangor for Uniphone Cables Sdn Bhd, Malaysia.
  Additional tankage & truck loading bay extension work for Mobil Kuantan Oil Terminal for Mobil Oil Malaysia Sdn Bhd, Malaysia. 
The Procurement and Fabrication of 2 units of 3300 IG AVGAS tanks for PDB Airport Depot, Langkawi.
The design, procurement, construction and commissioning of Field Erected Tanks for Sultan Salahuddin Abd Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad, Malaysia.
The design, procurement, construction and commissioning of Total  Cambodge Tank Farm for  Total Cambodia Ltd., Phonm Penh, Cambodia.
Procurement, construction & commissioning of 1 Jet-A1 fuel storage tank complete with pipeworks at Petronas Dagangan’s Bulk Depot, Langkawi, Malaysia.
The mechanical construction and commissioning of equipment erection, piping, (C.S./S.S./GRE/ UPVC) insulation and painting work for WR Grace Packaging Plant, Kuantan, Malaysia
The supply and extension and addition of 1 no. factory and 2 nos. warehouse to existing factory including ancillary and external works for Hume Industries (M) Bhd., Ipoh, Malaysia.
The engineering, procurement, construction and commmissioning of storage tanks for W.R.Grace, Malaysia 
S.S. 304 city water tank (5.0m dia. x 8 mH)
S.S.316 waste water collection tank (8m dia. x 10 mH)
C.S. dilute Sodium silicate tank(6m dia. x 8.2 mH)
C.S. water storage tank (11.6m dia. x 9.1 mH)
Procurement, construction, testing and commissioning of two nos. of fuel oil tanks for Petronas Sepangar Bay Depot, Sabah, Malaysia.
Fuel Oil Tank (2 units) : 17.0m Dia x 14.6 mH
Proposed supply and installation of Upgrading Fire Protection system for Tanjung Gelang installation.
Proposed supply and installation of  Upgrading Fire protection system for Sandakan installation.
The supply & construction of civil, building soil improvement work for block valves stations for Petronas Gas utilization project phase III -  Sector 1 gas pipeline from Port Klang to Lumut, Malaysia.
The supply of labour, equipment & consumable to mechanical and electrical work for Amoco No 1 PTA Plant, Gebeng Industrial Estate, Pahang
The supply of labour, equipment & consumable to fabricate and lay all mechanical equipment installation, aboveground and underground piping work for Amoco No.1 PTA Plant, Gebeng Industrial Estate, Pahang, Malaysia.
Major work quantities :
     Equipment installation (Total Weight = 1,886MT)
    Prefabrication and installation of 304,800 Diam-inch (3000MT) piping : (Piping Material: CiS, A-304L, A-316L, 1.25% Cr 0.5% Mo, Titanium, Hastelloy C, Uranus B-6)
    Structural Steel : 3,100 MT
    Electrical : Cabling 300,000M
    Instrumentation : Cabling 170,000M, Instruments 6,500 Nos.
    Insulation : 50,000 m2
The supply & construction of all civil and precast concrete process structure / piperack, equipment, foundation stainless steel lined ditches / pit etc in ISBL for Amoco No.1, PTA Plant, Gebeng Industrial Estate, Pahang, Malaysia.
The procurement and construction of civil, building, structural, tankage, piping, electrical and instrumentation work for Mobil Pulau Indah Oil/Solvent Terminal
Major Scope of Work :
Site Clearing and levelling (7.5 acres)
Main office building, warehouse, lorry filling shed, LLN sub-station and pump shed
Diesel Tank (4 units) : 25.9m Diam x 11.0mH
Mogas Tank (2 units) : 21.3m Diam x 11.0 mH
Regular Tank (2 units) : 15.2m Diam x 11.0 mH
Firewater Tank (2 units) : 13.7m Diam x 11.0 mH
Chemical Tank (4 units) : 10.7m Diam x 11.0 mH
Fire Hydrant and Foam System 
Product piping and 8" x 1.2Km cargo pipeline to jetty 
Electrical and instrumentation work 
The procurement, construction of mechanical equipment and process piping, including commissioning assistance for Polyethylene Malaysia Sdn Bhd (200,000 MTPY) Kerteh, Malaysia.
The supply of labour and equipment to assist pre-commissioning activities for Polyethylene Malaysia Sdn Bhd, Kerteh, Malaysia
The supply of labour, equipment & consumable to carry out equipment erection for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu (In association with Walter Wright Mammoet)
The supply of labour, equipment & consumable to fabricate and install above ground process piping work for Polyethylene Malaysia Sdn Bhd
The supply and constructtion of technical service laboratory for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu, Malaysia
To supply and construct control building and electrical sub-station for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu, Malaysia
To supply and construct equipment foundation for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu (civil work Lot 2), Malaysia
Major scope of work :
     Vertical equipment : 26 nos.
     Pumps/Ventilators : 33 nos.
     Horizontal vessels and heat exchangers : 4 nos.
     Structure foundation : 26 nos.
     Miscellaneous foundation : 26 nos.
     Elevated homogenisation : 1 no.
     Silo foundation
The re-construction of damaged mooring dolphin Petronas Sibu Terminal Jetty, Sarawak
The supply of labour, equipment and consumables to fabricate and install all hot and cold tie-in works and global metering for Lawit project at Esso Onshore Slugcatcher and Terengganu Crude Oil Terminal for Esso Production (M) Inc., Kerteh, Malaysia
The installation of Jet Fuel Hydrant pipeline from Terminal 1 to 2 and 3 for Subang International Airport for Petronas Dagangan Bhd, Malaysia
The design, fabrication, erection and painting of diesel fuel and water storage tanks for Tenaga Nasional Berhad Gas Turbine Project - Package A, Port Klang Power Station, Kapar, Klang, Malaysia 
Diesel Fuel Tank (2 nos)  :  30.0m dia. x 13.0 mH
Fire Water Tank (2 nos)  :  12.5m dia. x 13.0 mH
The civil, mechanical and electrical upgrading work for Esso Onshore Slugcatcher Facilities for Esso Production (M) Inc., Kerteh, Malaysia 
The procurement, construction and commissioning of Petronas Aviation Depot at Langkawi International Airport for Petronas Dagangan Bhd, Malaysia
The Civil / building / structural work for Air Separation Plant for Malaysian Oxygen Berhad at Pasir Gudang, Johore, Malaysia
The procurement, construction, testing and commissioning of Bulk Storage Facilities for Mobil Kuantan Terminal for Mobil Oil Malaysia Sdn Bhd., Malaysia
Major scope of work :
     Site clearing and sand filling of 4.5 acres site
     Main office building, warehouse, lorry filling shed, pumps and valve manifold shed
    Gasoline tank (2 units) : 24.4m Diam x 9 mH
     Diesel tank (2 units)     : 24.4m Diam x 9 mH
     Fire water tank (1 unit)  : 18.3m Diam x 9 mH
     Fire hydrant and foam system
     Product piping and 10 inch diam 1.6Km cargo pipeline
     Electrical and instrumentation system
     Infrastructure work
Procurement, construction and commissioning of Petronas Sibu Bulk Storage facilities for Petronas Dagangan Bhd., Malaysia
Major scope of work :
     Jungle clearing and sand-filling - 7 acre site
     40m long jetty on 700mm x 600mm dia. Prestressed concrete spun piles
     4 x 1844 KL, 1 x 2519KL, 3 x 3279Kl product storage tanks c/w R.C. foundation on 600mm dia prestressed concrete spun piles and concrete slab lined earth bundwall
     6"- 8" diam cargo pipelines and all product delivery pipelines
     R.C. office, structural steel warehouse, lorry filling shed, drum filling shed, fire pump shed, switch room & w/shop
     Fire fighting system
     Electrical and instrumentation system
     Fencing, roadwork and general landscaping
The fabrication, erection, testing and commissioning of aboveground process piping and mechanical process equipment installation for Naptha Cracking Plant (230,000 MTPY) for Titan Petrochemicals (M) Sdn Bhd., Johore, Malaysia
Major work quantities :
     Prefabrication and erection of 150,000 diam-inch of pipework (Piping material : A53GrB, A333 GrB, A312-TP304, A312-TP316, A335GrP11,A333Gr3)
     Hydrotest (150 test packages)
     Pre-commissioning assistance
The procurement and installation of all carbon steel, stainless steel copper and aluminium piping work, equipment installation, painting, cold and hot insulation for MOX Pasir Gudang Air Separation Plant for Malaysia Oxygen Berhad, Malaysia
The engineering, procurement and installation of hydrogen and nitrogen gas distribution pipeline from Malaysia Oxygen Bhd Plant to Pasir Gudang Industrial Estate for Malaysian Oxygen Berhad.
Hydrogen Pipeline : 6" x 1.8 Km
Nitrogen Pipeline : 8" x 3.2 Km
Road Boring : 600 mm Diam x 12 length (5 locations)
The upgrading work for the high and low flare system for Terengganu Crude Oil Terminal, (Emergency shut down work) for Esso Production (M) Inc., Kerteh, Malaysia.
The installation of all carbon, alloyed and stainless steel piping, erection of process equipment insulation and painting works for the Kuantan Gas Compressor and Paka Metering Station, for Petronas Gas Sdn Bhd, Malaysia
Major work quantities :
     Equipment installation  Total weight = 504 MT
     Mechanical piping installation  (Total = 60,000 diam-inch)
     Insulation for Gas Piping System : 1,200 m2
To supply labour , equipment, materials and consumables for the fabrication, installation, testing and commissioning of the mechanical and electrical works for the Esso Onshore Slugcatcher Facilities, Malaysia. 
     Fabrication & installation of slugcatcher fingers consisting of 10 tubes of 42 inch dia. x 50.8mm thick x 1,200 ft long pipe.
     Fabrication & installation of 1 no. 28 inch dia. and 1 No.8 inch dia. Condensate pipelines from Beach tie-in to slugcatcher site 9200mm each.
     Flare system & flare stack
     Firewater piping system & firewater tank (916m dia. x 7.5m H)
     Carbon/stainless/alloyed steel/process/utility piping
     Installation of Gas scrubbers (174t) Condensate separators (106T) Condensate coalescer (20T) Flare scrubbers (27T) and others.
     Uninterrupted power supply system.
     Gaitronics communications system.
     Electrical grounding grid for all tank & steel structure
     Lighting & receptacle system.
     Custody gas metering system.
     Pre-commissioning of mechanical, electrical and instrumentation systems.
     Commissioning assistance
The engineering, procurement, construction and commissioning of piperack structure for equipment unit 266 / 024 silo.
The engineering, procurement, construction and commissioning of 1 unit of 3500mm dia. X 83200mmH steel silo inclusive of steel supporting structures. 
The Engineering, procurement, construction and commissioning of 4 units of 6756mm dia. X 15230mmH steel silo inclusive of steel supporting structures. 
The construction, testing and commissioning of all civil, mechanical, piping, electrical and instrumentation work for the Natural Gas Metering & Supply System for Stage I & III Boiler Gas Conversion project at Senoko Power Station Singapore
The engineering, procurement, construction and testing of 300mm dia. X 3.2 km carbon steel sch 60 and 300mm dia. Acid pipeline from Kemaman Supply Base to Tioxide Sulphuric Acid Handling Facilities at Telok Kalong Industrial Estate for Tioxide Group Service
The installation of refractory work for 4 units of UCS cracking furnance for Naptha Cracking Plant, Pasir Gudang, Johore
The engineering, procurement, erection, painting, testing and commissioning of the complete mechanical, piping electrical and instrumentation work for Condensate Storage and Handling facilities (Onshore Slugcatcher) for Esso Production (M) Inc., Malaysia.
Major work quantities :
     Structural steel pipe rack fabrication and erection
     Piping spool pre-fabrication and erection
     Piping, equipment installation, electrical and  instrumentation work for gas metering skid 
     Condensate pump installation and testing
     Electrical grounding grid for all steel structue
     Programme logic controller (PLC) to control all shutdown system (Tie-in to the existing modicon system)
     Gaitronic communication system for audio communication at new plant area
     Distributed control system (DCS) to provide operating details for new plant facilities in the existing system and allow control from the console located in the main control room
     Lighting and receptable system for all new facilities and 240V
     Hydrostatic tank gauging system
     Fibre optic detection system for tank farm
The engineering, procurement, construction, testing and maintenance of three nos. of vertical storage tanks (2 nos. 29.3m dia. / 14.6mH and 1 no. 17.1m dia. X 14mh) c/w foundation, fire fighting facilities and associated piping and electrical work at Petr
The installation of all u/g pipes, incl. pipe trench excavation, backfilling, anti corrosion wrapping and hydrotesting at Gas Processing Plant Expansion Project, Kerteh, Terengganu
Procurement, construction and commissioning of storage tank for JET A1 at PDSB's aviation fuel farm at Subang International Airport.
The construction of main office warehouse, lorry filing shed, drum filling shed drains, fencing, road work and general earthwork for the proposed Shell Tawau Complex. 
The construction and completion of proposed site office extension, warehouse and workshop for Henkel Oleochemicals (M) Sdn Bhd, Banting , Malaysia.
The civil / building and structural construction of the proposed hydrogen Plant at Pasir Gudang Johore Darul Takzim for M.O.X Berhad
Site cleaning, general earthwork, internal road, temporary and permanent drain, fencing, road crossing and other civil works for Phase II Onshore Slugcatcher Facilities for Esso Production (M) Inc., Malaysia.
Major scope of work :
     Area   : 220 acres (900,000 m3)
     Excavation   : 150,000 m3
     Filling   : 1,000,000 m3
     Drainage   : 7,000 m (900 mm to 3600 mm W)
     Concrete   : 30,000 m3
     Fencing   : 4,000 m
     Road Pavement   : 4,500 (4m width)  ;  1,600 m (6m width)
     Gabion/Mattress/Geotextile   : 20,000 m2
     Turfing   : 300,000 m2                                 
The engineering, procurement, erection of 9 nos. of internally lined and unlined cone roof storage tanks for Tioxide Chemicals Plant at Kemaman, Terengganu
Proposed tank farm & gantry at Telok Panglima Garang, Banting, Selangor for Henkel Oleochemicals (M) Sdn Bhd
Installation of Menthor - 26 Storage Tank and associated piping works for EMB at Kemaman Petroleum Supply Base.
Prefabrication and installation of 3" to 48" pipe spools and piping system on elevated piperack to tie-in to new floating roof tank T-446, including all electrical and instrumentation work at Terengganu Crude Oil Terminal, Kerteh. (All materials supplied 
Construction of 1 no 15m dia. x 14mH fire water tank, pump house and associated piping work for Shell Tawau Depot, Sabah
The construction of 3 nos. 35' dia. x 30'H M.S. Storage tank at Dovechem Terminals Kuantan.
The engineering, procurement and installation of 6" dia. & 4" dia. Oxygen / Nitrogen pipeline from MOX Plant to ASM, UNICHEMA and Bradford Plants at Bukit Raja Industrial Estate, Shah Alam, for Malaysia Oxygen Berhad, Malaysia.
Site clearing, earthwork, concrete / timber piling, main office building, LLN sub-station, piperack structure, machinery foundation, road pavement, drainage, turfing, fencing and associated works for an Air Separation Plant for Malaysia Oxygen Berhad, Buk
Site clearing, earthwork, steel structure for LPG Bottling Plant Hall, LLN Sub-station, Gas Compressor Shed, drainage, roadwork, fencing and associated work for LPG Storage cum Bottling Plant for Shell Malaysia Trading Sdn Bhd, Pasir Gudang, Malaysia.
The construction of roads and drain and buildings for Compressor Booster Station at Terengganu Crude Oil Terminal for Esso Production (M) Inc., Kertih, Malaysia.
The construction of the proposed 2 - storey Laboratory building c/w timber piling works at Jalan Banting, Selangor
The construction of the proposed rebuilding Esso Service Station on Lot T.L.O 41111 at Jalan Harimau / Jalan Harimau Tarum, Taman Century, Johore
The procurement, erection, design and commissioning of 1 x 50' dia. X 36'H storage tank at Esso Kuching Terminal, Sarawak
The design, construction and commissioning of Sodium Acid Metaphosphate Plant
The construction of 9 nos. of bulk storage tanks and all associated piping works, including 1.6 km three 10-inch cargo lines from the Jetty for Shell Pasir Gudang Depot, for Shell Malaysia Trading Sdn Bhd, Malaysia.
Proposed Shell Services Station at P.T. 241, Wangsa Maju, Setapak, Wilayah Persekutuan
The construction, completion and maintenance of roads, drains, petroleum products tank foundation and associated works for Shell Depot (Phase 1) C67for Shell Malaysia Trading Sdn Bhd, Bintulu, Malaysia.
The construction of laboratory and office  ext. building, new packaging supervisor room and fire rated brickwall and associated works.
Installation of Heating Facilities for Storage of Residual Fuel Oil at Esso Bagan Luar Terminal.
The construction of Shell Service Station at Taman Sri Muda, Shah Alam, Selangor 
Proposed Shell Service Station on Lot T.L. 77, Jalan Apin-Apin, Keningau, Sabah
Supply, delivery, installation, testing and commissioning of first manholes, sewer pipe and installation for Hostel III, IV, V at University Technology of Malaysia, Skudai, Johore
Construction of new warehouse, roadwork, fencing and associated works
Improvement to roadwork, fencing tank farm, catwalk / platform for Shell Depot at Keningau, Sabah