Upgrading Works on Fuel Oil
Storage on Funadhoo Island, Republic of Maldives |
| |
The Engineering,
Procurement, Construction & Commissioning for Gas Processing Plant 1 (GPP
1) & Export Terminal 1&2 (ET 1&2) Rejuvenation & Revamp
Project (In Consortium with Mitsubishi Heavy Industries Ltd., Japan), Kerteh,
Terengganu |
| |
MLNG Rejuvenation &
MLNG/MLNG2 Revamp (MRR) Project Bintulu, Sarawak - Module 2 & 3 (JV with
Astel Peineger/Kumus) |
| |
Main Construction Package,
Ammonia and Urea Plant Revamp Project, Bintulu, Sarawak, Malaysia (JV with
PDIL) |
| |
Design, Procurement and
Management of Building and Infrastructure Works for housing facilities for
Armed Forces, Sungai Besi, Kuala Lumpur, Malaysia |
| |
The Engineering, Procurement
& Construction for Installation of New Balancing Tank |
| |
MLNG Rejuvenation &
MLNG/MLNG Dua Revamp (MRR) Project, Bintulu, Malaysia - Offsites & Common
Facilities Painting |
| |
Provision of supervision,
skilled labor, tools, equipment and consumables to assemble Blocks 36 and 37
of the DSS20 Semi-Submersible (H103), Baku, Azerbaijan |
| |
Nam Con Son Condensate
Storage Tank Project, Vungtau, Republic of Vietnam |
| |
MLNG Rejuvenation &
MLNG/MLNG Dua Revamp (MRR) Project, Bintulu, Malaysia - Module 1 Painting
Work |
| |
Procurement,
Construction and Commissioning Service for Petronas Gas Processing Plant Nos.
2, 3 & 4, Ethane Extraction Improvement Project, Kerteh, Terengganu |
| |
Technical
Building Works for Pump Station No 2, Dompta (PS2) and Pump Station No 3,
Belabo (PS3) for Tchad-Cameroon Pipeline Project, Republic of Cameroon |
| |
Provision of Engineerig and
Installation Service for the Mechanical Erection Works at Pump Station 2
(PS2) for the Tchad-Cameroon Pipeline Project, Dompta, Republic of Cameroon |
| |
Provision of supervision,
skilled labour, tool, equipment and consumables to fabricate, assemble and
erect steel structure on Living Quarters and E-generator Block to Upper Hull,
Baku, Azerbaijan |
| |
The Procurement,
Construction and Commissioning of New Desalination Plant for Malaysian LNG
Complex, Bintulu, Malaysia |
| |
Project Management Service
for the Ampa-Fairley Onshore Compression and Slugcatcher Facilities for
Brunei LNG Complex, Brunei |
| |
The piping and equipment
insulation works for SBR Latex Production Plant, Kluang, Johore |
| |
Off-skid Piping
Prefabrication For Centralised Utilities Facilities at Kerteh, Terengganu |
| |
Steam Piping Prefabrication
For Centralised Utilities Facilities at Kerteh, Terengganu |
| |
The detail design, supply,
fabrication, installation and testing of piping and mechanical works for SBR
Latex Production Plant, Kluang, Johore |
| |
Civil and reinforced
concrete structure work for Kuantan Waste Water Treatment & Debottleneck
for BP/Amoco No. 1 PTA, Plant, Kuantan |
| |
The
piping installation works to the PPD Facility and West Extension to existing
Manufacturing Building for Cryovac (Malaysia) Sdn Bhd, Kuantan, Pahang |
| |
The
procurement, construction and commissioning of Unity Field Water Injection
Facilities, Phase 1, for Muglad Basin Oil Development, Republic of Sudan |
|
|
The Engineering,
Procurement, Construction and Commissioning of Second Effluent Underground
Discharge Line for Trengganu Crude Oil Terminal, Kerteh |
|
|
The Procurement and
Construction of all Civil and Foundation Work for Low Density Polyethylene
(LDPE) Plant. Capacity : 255,000 TPY. |
|
Major Work Quantities : |
|
Concrete : 16,000 |
|
Rebar : 2,500 |
|
Formwork : 33,000 |
|
Drainage : 6,000 |
|
Roadwork : 5 |
|
|
The Procurement,
Construction and Commissioning of Mechanical Erection, Piping Prefabrication
and Erection, Steel Structure Work, Insulation and Painting work for
Petronas/UCC Olefin Plant OSBL facilities. |
|
|
The Deign, Procurement,
Cosntruction of Main Office Building, Electrical MCC Building, Sub-station,
Control/Lab Building and Guard House for a Crystex (insoluble sulphur) Plant
for Flexsys Chemicals Sdn Bhd. |
|
|
The Design, Procurement,
Construction of Warehouse, Schedule Waste Storage and Maintenance / Spare
Parts Buildings for a Crystex (insoluble sulphur) Plant for Flexsys Chemicals
Sdn Bhd. |
|
|
The Engineering,
Procurement, Construction, Commissioning and Handover of 2 Nos. of The Garaad
New Wells and 10.8 Km of Underground 8" Diameter Flowline and 1 Km of
Underground 6" Diameter Flowline, for Field Surface Facilities, Muglad
Basin Oil Developme |
|
|
The
Engineering, Procurement, Construction, Commissioning and Handover of 7 Nos.
of The Unity New Wells and 30 Km of Underground 6" Diameter Flowline,
for Field Surface Facilities (Phase 2) for Muglad Basin Oil Development,
Republic of Sudan |
|
|
Civil Work for OSBL
Facilities and Infrastructure for Petronas/UCC Olefin Plant, Kerteh,
Terengganu |
|
|
The Procurement,
Construction and Commissioning Assistance for the Mechanical Equipment
Installation, Piping Installation, Painting, Hot and Cold Insulation Work for
Propane Dehydrogenation Complex (Petronas MTBE Plant Extension), Kuantan,
Malaysia |
|
Prefabrication and
Installation of 300,000 diam-inch of piping |
|
Structure Steel 1,600 MT |
|
Cold Insulation 12,500 m2 |
|
Hot Insulation 2,000 m2 |
|
|
The Design, Procurement,
Construction & Commissioning of Jet Fuel Storage Expansion and Upgrading
of Male' International Airport, Republic of Maldives |
|
|
The Procurement,
Construction and Commissioning Assistance for the Mechanical Equipment
Installation, Structural Steel Erection, Carbon Steel/Stainless Steel/Alloyed
Steel Piping Prefabrication and Erection Work for Petronas Ammonia/Syngas
Complex, Kerteh |
|
Major Work Quanitities : |
|
Fabrication and Erection of 250,000
diam-inch of piping (Piping materials: 2.25% Cr 1% Mo, 1.25% Cr 0.5% Mo,
S316L & A333 |
|
Erection of 2100 MT Structural Steel |
|
Installation of 3500 MT of Mechanical
Equipment |
|
|
The engineering, procurement
and construction of shore protection works at Bulk Storage Depot at Sombrong
Keinsway, Thom, Phnom Penh. |
|
|
The Procurement,
Construction and Commissioning of the Mechanical Erection and Piping
Insulation & Painting Works for Poly Vinyl Chloride (PVC) Project,
Kerteh, Terengganu. |
|
Major Work Quantities : |
|
Piping 100,000 dia-inch |
|
Mechanical Equipment 1100 MT |
|
Structural Steel 500 MT |
|
Cold Insulation 500m2 |
|
Hot Insulation 1000m2 |
|
|
The provision of site
supervision and labour for the installation of heavy process equipment (total
weight: 3500 MT), Mechanical/Piping and other Mechanical Works for
Petronas/BASF 160,000 MTPY Acrylic Acid Complex, Kuantan, Pahang, Malaysia. |
|
Major Process Equipment : |
|
Reactor R-2100/R-2000 (2 x 234 mT, 7.2m
diam x 3.2mH) |
|
Reactor R-2150/R-2250 (2 x 249 mT, 7.2m
diam x 3.2mH) |
|
Absorption Tower T3100 (215 mT, 6.2m diam
x 51.3 mH) |
|
Finishing Tower T3300 (174 mT, 4.2m diam
x 40.2 mH) |
|
Waste Heat System Boiler for 10 MV Steam
Turbine (150 MT) |
|
|
Supply, Fabrication and Delivery of Solution
Storage Tank work for Petronas Ammonia / Syngas Complex, Kerteh,
Terengganu |
|
|
The fabrication and
installation of piping and erection of crude oil pumping stations Nos. 1, 3
and 5 for Muglad Basin Oil Development, Republic of Sudan |
|
|
The Engineering,
Procurement, Construction, Commissioning and Handover of Field Surface
Facilities, Phase 1, for Muglad Basin Oil Development for Greater Nile
Petroleum Operating Co.Ltd., Republic of Sudan. |
|
Scope of work : |
|
Construction and installation of
flowlines from wells located at Unity and EI Toor up to the manifold at
respective field production facilities (FPF) |
|
Installation of a 3.3KV overhead
electrical power distribution from the field production facilities (FPF) up
to respective field surface facilities (FSF) location. |
|
Equipment installation and ancillary
piping work |
|
Associated electrical work at field
surface facilities (FSF) |
|
Control and shutdown system |
|
Condensate metering system |
|
Chemical injection system |
|
Pig launching and receiving facilities
to the flowline |
|
Utility and safety systems |
|
Roads, drainage, fencing and other
civil work |
|
Radio link data communication system |
|
Total No. of wells : 43 |
|
Crude Oil Piggable Pipelines
: 4" : 40 |
|
Crude Oil Piggable Pipelines
: 6" : 17 |
|
Crude Oil Piggable Pipelines
: 8" : 5 |
|
Crude Oil Piggable Pipelines
: 12" : 3 |
|
|
The Engineering, Supply,
Erection and Commissioning of Tank Farm for Centralised Utility Facilities for Petronas Gas Bhd.,
Kerteh, Malaysia. |
|
Raw Water Tank (4 units) :
50m |
|
Demin Water Tank (2 units) :
24m |
|
Potable Water Tank (2 units)
: 8m Dia |
|
Condensate Water Tank (2
units) : 25.5m |
|
|
The Engineering,
Procurement, Fabrication and Erection of 1,800 MT of piperack and building
structural steel for Petronas Aromatics, Kerteh, Malaysia (sub-contract from
Toyo Engineering Corporation) |
|
|
The Supply, Construction and
Erection of all precast piperack for Petronas Aromatics Plant, for Toyo
Engineering Corporation, Kerteh, Malaysia. Total Nos. : 1200 pcs |
|
|
Procurement and Construction
of Civil Work for Processing Units Nos. 1, 2, 3, 4 & 5 for Petronas
Aromatics Plant, Kerteh, Terengganu, Malaysia (In joint venture with Nam Fatt
Construction Sdn Bhd) |
|
Major Work Quantities : |
|
Excavation : 60,000 m3 |
|
Concrete : 16,000 m3 |
|
Rebar : 1,200 MT |
|
Formwork : 30,000 m3 |
|
Fireproofing : 600 m3 |
|
Roadwork : 600 m3 |
|
|
The Engineering, Procurement
and Construction of Workshop for Petronas Aromatics Plant, Kerteh, Terengganu
for Toyo Engineering & Construction Sdn Bhd, Malaysia. |
|
|
The Procurement and
Construction of the Main Administration Office Complex for Vinyl Chloride
Monomer Plant, for Petronas Gas Sdn Bhd, Kerteh, Malaysia. |
|
|
The Procurement,
Installation and Commissioning of Feed Liquid Flow Controllers at Petronas
Gas Processing Plant No. 2, Kerteh, Terengganu, Malaysia |
|
|
The Procurement,
Construction and Commissioning of Petronas Second Refinery Sewer and Effluent
Treatment System Modification Work for Petronas Penapisan Melaka Sdn Bhd.,
Malacca, Malaysia. |
|
|
The civil, building, HVAC,
electrical and fire-fighting protection and other mechanical works for Motor
Vehicle Spare Parts Manufacturing Facilities, Banting, Selangor Darul Ehsan,
for Kayaba (M) sdn Bhd, Malaysia. |
|
|
The Mechanical/Piping Work
for Make Pack and Central Plant for Philip Morris new cigarette processing
facilities expansion project, Seremban, Malaysia. |
|
|
Site Grading/Foundation
Piling for new Philip Morris Cigarette Facility Expansion Project, Seremban,
Malaysia. |
|
|
The Engineering,
Procurement, Construction, Commissioning and Handover of the Petronas Onshore
Gas Terminal, for Petronas Carigali Sdn Bhd, Malaysia |
|
Major scope of work : |
|
Gas / condensate receiving facilities
(slugcather) |
|
Bypass facilities (bypass vessel when
slugcather is offline) |
|
2 x 100% Gas scrubbing facilities ( to
separate condensate from gas) |
|
1 x 100% condensate stabilization train
and condensate storage tanks |
|
Gas & condensate metering system |
|
High and low flare system and blowdown
system |
|
AOC / COC drainage system (GRE pipes) |
|
Wastewater treatment system
(IGF/CPI/CDF) |
|
Main office building/workshop control
room / MCC room truck loading shed |
|
Electrical supply and distribution
system (Gas Generator / Diesel Generator / MCC & switch) |
|
DCS system |
|
UPS system |
|
Alarm & ESD system |
|
HVAC system |
|
Public address & alarm system |
|
Fuel gas system |
|
Diesel storage tank & diesel fuel
transfer system |
|
Instrument & utility air system |
|
Firewater distribution system |
|
Service water distribution system |
|
Precommissioning and commissioning |
|
|
Central Plant Demolition,
Piling Foundation and Building Works for new cigarette processing facilities
expansion project. |
|
|
The Engineering,
Procurement, Construction and Commissioning of Jet A-1 Drain Down Tank at
Forward Fuel Base Kuala Lumpur International Airport Aviation Terminal,
Sepang, Malaysia |
|
|
The Engineering,
Procurement, Construction and Commissioning of Fuel Oil and Potable Water
Storage Tanks for Powertron Power Station, for Peremba-Kentz Engineering Sdn
Bhd, Sabah, Malaysia. |
|
|
The Design, Procurement,
Construction and Commissioning of Bulk Storage Depot for Petronas Cambodia
Co. Ltd., Phnom Penh Cambodia. (JV with Technip Far East Sdn Bhd) |
|
Major Scope of Work : |
|
Gasoline Tank : 16m Dia |
|
Super Gasoline Tank : 16m
Dia |
|
Diesel : 18.3m |
|
|
The Design, Procurement,
Construction and Commissioning of Caltex Sihanoukville Bulk Storage Depot for
Caltex Services Cambodia Ltd, Cambodia. |
|
Major Scope of Work : |
|
MOGAS Tank (92R) : 17m Diam
x |
|
MOGAS Tank (83R) : 17m Diam
x |
|
Diesel Tank : 18.4m Diam x |
|
|
The Procurement,
Construction and Commissioning of Mechanical / Piping Works for Kuala Lumpur
International Airport Aviation Terminal, Malaysia. |
|
|
The Engineering,
Procurement, Construction of Main Office Complex for Petronas Kuala Lumpur
International Airport Aviation Fuel Terminal, Malaysia. |
|
|
The Procurement and
Construction of Civil Works and Structural Steel Shelters for Kuala Lumpur
International Airport for Petronas/Malaysia Airline System/Malaysia Airport
Bhd. |
|
|
The Design, Procurement,
Construction and Commissioning of 8 Nos. of Jet Fuel Storage Tanks for
Petronas Kuala Lumpur International Airport Aviation Fuel Terminal, Malaysia |
|
Scope of Work : |
|
Jet A-1 Tank: 8 nos. 31.5m Diam x 19.0mH (14,000 cum) |
|
|
Bored Piling Work and
Earthwork for Cabot Unit 3 Project, Port Dickson, Malaysia. |
|
|
Renew piping for pumping
station for Petronas Dagangan Aviation Depot at Subang International Airport,
Selangor |
|
|
Site Grading / Foundation
Piling for Philip Morris Cigarette Facility Expansion Project, Seremban,
Malaysia. |
|
|
The
Earthwork and related civil work for proposed Fleet Management Terminal for
Klang Valley Distribution Terminal for Shell/Petronas J.V, |
|
|
The
Procurement, Construction & Commissioning Assistance for The Replacement
Works of Cold Box T3-401 at Gas Processing Plant No 3, Kerteh,
Terengganu. |
|
|
The Procurement,
Construction and Commissioning of additional fuel hydrant line at Bayan Lepas
International Airport, for Petronas Dagangan Berhad, Malaysia. |
|
|
The Design, Procurement,
Construction and Commissioning of Field Erected Tanks for Sultan Salahuddin
Abd Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad, Malaysia. |
|
|
The
Procurement, Construction and Commissioning of Mobil Kuantan Terminal
Expansion Project, Pahang Darul Makmur. |
|
|
The piping, mechanical,
steel structures & painting works for Amoco No. 1 PTA Plant
Debottlenecking Project for Amoco Chemical (M) Sdn Bhd., Kuantan, Malaysia. |
|
|
Engineering, Procurement, Construction and Commissioning
of Klang Valley Distribution Terminal, Selangor (Consortium of : Sumatec -
Nam Fatt - Babcock K-W) |
|
The detailed scope of work
is as follows : |
|
Site grading / earth work / rock
blasting |
|
Surface water / AOC / COC Drainage
system |
|
Tank foundation / bund wall |
|
Main office building |
|
Warehouse |
|
Driver shed |
|
Tank truck loading shed |
|
Electrical sub-station |
|
Inspection / Guard House |
|
Elevated piperack |
|
10
x 15,000 cum cone roof product
storage tank |
|
2
x 9,000 cum cone roof water
tank |
|
4
x 1,000 cum cone roof additive
tank |
|
3
x 1,500 cum cone roof
interface tank |
|
Inter tank piping system |
|
Tank truck loading with additive
injective facilities |
|
Fire hydrant and foam system |
|
Fire detection and alarm system |
|
Tank truck automation system |
|
Emergency shut down system |
|
Public address system |
|
CCTV |
|
Power supply and distribution |
|
UPS system |
|
Earthing & bonding |
|
Telephone system |
|
Pre-commissioning and commissioning |
|
Handover / Documentation |
|
|
The supply, construction and
erection work for all precast piperack for Petronas Gas Processing Plant
5&6 for Daelim Engineering & Industrial Co. Ltd, Malaysia |
|
Total Nos. : 1,300 pcs |
|
|
The engineering, procurement
& commissioning of storage tanks for Phnom Penh Power Station, Cambodia. |
| |
The
supply and Construction of Fibre Optic Cable manufacturing factory at Bandar
Baru Bangi, Selangor for Uniphone Cables Sdn Bhd, Malaysia. |
| |
The supply and Construction
of Aluminium Rod Manufacturing Factory at Bandar Baru Bangi, Selangor for
Uniphone Cables Sdn Bhd, Malaysia. |
| |
Additional
tankage & truck loading bay extension work for Mobil Kuantan Oil Terminal
for Mobil Oil Malaysia Sdn Bhd, Malaysia. |
|
|
The Procurement and
Fabrication of 2 units of 3300 IG AVGAS tanks for PDB Airport Depot,
Langkawi. |
|
|
The design, procurement,
construction and commissioning of Field Erected Tanks for Sultan Salahuddin
Abd Aziz Power Station Phase 3 Project, for Tenaga Nasional Berhad, Malaysia. |
|
|
The design, procurement,
construction and commissioning of Total
Cambodge Tank Farm for Total
Cambodia Ltd., Phonm Penh, Cambodia. |
|
|
Procurement, construction
& commissioning of 1 Jet-A1 fuel storage tank complete with pipeworks at
Petronas Dagangan’s Bulk Depot, Langkawi, Malaysia. |
|
|
The mechanical construction
and commissioning of equipment erection, piping, (C.S./S.S./GRE/ UPVC)
insulation and painting work for WR Grace Packaging Plant, Kuantan, Malaysia |
|
|
The supply and extension and
addition of 1 no. factory and 2 nos. warehouse to existing factory including
ancillary and external works for Hume Industries (M) Bhd., Ipoh, Malaysia. |
|
|
The
engineering, procurement, construction and commmissioning of storage tanks
for W.R.Grace, Malaysia |
|
S.S. 304 city water tank
(5.0m dia. x 8 mH) |
|
S.S.316 waste
water collection tank (8m dia. x 10 mH) |
|
C.S. dilute
Sodium silicate tank(6m dia. x 8.2 mH) |
|
C.S. water storage
tank (11.6m dia. x 9.1 mH) |
|
|
Procurement, construction,
testing and commissioning of two nos. of fuel oil tanks for Petronas Sepangar
Bay Depot, Sabah, Malaysia. |
|
Fuel Oil Tank (2 units) :
17.0m Dia x 14.6 mH |
|
|
Proposed supply and
installation of Upgrading Fire Protection system for Tanjung Gelang
installation. |
|
|
Proposed
supply and installation of Upgrading
Fire protection system for Sandakan installation. |
|
|
The supply &
construction of civil, building soil improvement work for block valves
stations for Petronas Gas utilization project phase III - Sector 1 gas pipeline from Port Klang to
Lumut, Malaysia. |
|
|
The supply of labour,
equipment & consumable to mechanical and electrical work for Amoco No 1
PTA Plant, Gebeng Industrial Estate, Pahang |
|
|
The supply of labour,
equipment & consumable to fabricate and lay all mechanical equipment
installation, aboveground and underground piping work for Amoco No.1 PTA
Plant, Gebeng Industrial Estate, Pahang, Malaysia. |
|
Major work quantities : |
|
Equipment installation (Total Weight =
1,886MT) |
|
Prefabrication and installation of
304,800 Diam-inch (3000MT) piping : (Piping Material: CiS, A-304L, A-316L,
1.25% Cr 0.5% Mo, Titanium, Hastelloy C, Uranus B-6) |
|
Structural Steel : 3,100 MT |
|
Electrical : Cabling 300,000M |
|
Instrumentation : Cabling 170,000M,
Instruments 6,500 Nos. |
|
Insulation : 50,000 m2 |
|
|
The supply &
construction of all civil and precast concrete process structure / piperack,
equipment, foundation stainless steel lined ditches / pit etc in ISBL for
Amoco No.1, PTA Plant, Gebeng Industrial Estate, Pahang, Malaysia. |
|
|
The procurement and
construction of civil, building, structural, tankage, piping, electrical and
instrumentation work for Mobil Pulau Indah Oil/Solvent Terminal |
|
Major Scope of Work : |
|
Site Clearing and levelling
(7.5 acres) |
|
Main office building,
warehouse, lorry filling shed, LLN sub-station and pump shed |
|
Diesel Tank (4 units) :
25.9m Diam x 11.0mH |
|
Mogas Tank (2 units) : 21.3m
Diam x 11.0 mH |
|
Regular Tank (2 units) :
15.2m Diam x 11.0 mH |
|
Firewater Tank (2 units) :
13.7m Diam x 11.0 mH |
|
Chemical Tank (4 units) :
10.7m Diam x 11.0 mH |
|
Fire Hydrant and Foam System |
|
Product
piping and 8" x 1.2Km cargo pipeline to jetty |
|
Electrical and instrumentation
work |
|
|
The procurement,
construction of mechanical equipment and process piping, including
commissioning assistance for Polyethylene Malaysia Sdn Bhd (200,000 MTPY)
Kerteh, Malaysia. |
|
|
The supply of labour and
equipment to assist pre-commissioning activities for Polyethylene Malaysia
Sdn Bhd, Kerteh, Malaysia |
|
|
The
supply of labour, equipment & consumable to carry out equipment erection
for Polyethylene Malaysia Sdn Bhd, Kerteh, Terengganu (In association with
Walter Wright Mammoet) |
|
|
The
supply of labour, equipment & consumable to fabricate and install above
ground process piping work for Polyethylene Malaysia Sdn Bhd |
|
|
The
supply and constructtion of technical service laboratory for Polyethylene
Malaysia Sdn Bhd, Kerteh, Terengganu, Malaysia |
|
|
To supply and construct
control building and electrical sub-station for Polyethylene Malaysia Sdn
Bhd, Kerteh, Terengganu, Malaysia |
|
|
To
supply and construct equipment foundation for Polyethylene Malaysia Sdn Bhd,
Kerteh, Terengganu (civil work Lot 2), Malaysia |
|
Major scope of work : |
|
Vertical equipment : 26 nos. |
|
Pumps/Ventilators : 33 nos. |
|
Horizontal vessels and heat exchangers :
4 nos. |
|
Structure foundation : 26 nos. |
|
Miscellaneous foundation : 26 nos. |
|
Elevated homogenisation : 1 no. |
|
Silo foundation |
|
|
The re-construction of
damaged mooring dolphin Petronas Sibu Terminal Jetty, Sarawak |
|
|
The
supply of labour, equipment and consumables to fabricate and install all hot
and cold tie-in works and global metering for Lawit project at Esso Onshore
Slugcatcher and Terengganu Crude Oil Terminal for Esso Production (M) Inc.,
Kerteh, Malaysia |
|
|
The
installation of Jet Fuel Hydrant pipeline from Terminal 1 to 2 and 3 for
Subang International Airport for Petronas Dagangan Bhd, Malaysia |
|
|
The
design, fabrication, erection and painting of diesel fuel and water storage
tanks for Tenaga Nasional Berhad Gas Turbine Project - Package A, Port Klang
Power Station, Kapar, Klang, Malaysia |
|
Diesel Fuel Tank (2
nos) :
30.0m dia. x 13.0 mH |
|
Fire Water Tank (2 nos) :
12.5m dia. x 13.0 mH |
|
|
The
civil, mechanical and electrical upgrading work for Esso Onshore Slugcatcher
Facilities for Esso Production (M) Inc., Kerteh, Malaysia |
|
|
The
procurement, construction and commissioning of Petronas Aviation Depot at
Langkawi International Airport for Petronas Dagangan Bhd, Malaysia |
|
|
The Civil / building /
structural work for Air Separation Plant for Malaysian Oxygen Berhad at Pasir
Gudang, Johore, Malaysia |
|
|
The procurement,
construction, testing and commissioning of Bulk Storage Facilities for Mobil
Kuantan Terminal for Mobil Oil Malaysia Sdn Bhd., Malaysia |
|
Major scope of work : |
|
Site clearing and sand filling of 4.5
acres site |
|
Main office building, warehouse, lorry
filling shed, pumps and valve manifold shed |
|
Gasoline tank (2 units) : 24.4m Diam x 9
mH |
|
Diesel tank (2 units) : 24.4m Diam x 9 mH |
|
Fire water tank (1 unit) : 18.3m Diam x 9 mH |
|
Fire hydrant and foam system |
|
Product piping and 10 inch diam 1.6Km
cargo pipeline |
|
Electrical and instrumentation system |
|
Infrastructure work |
|
|
Procurement, construction
and commissioning of Petronas Sibu Bulk Storage facilities for Petronas
Dagangan Bhd., Malaysia |
|
Major scope of work : |
|
Jungle clearing and sand-filling - 7
acre site |
|
40m long jetty on 700mm x 600mm dia.
Prestressed concrete spun piles |
|
4 x 1844 KL, 1 x 2519KL, 3 x 3279Kl
product storage tanks c/w R.C. foundation on 600mm dia prestressed concrete
spun piles and concrete slab lined earth bundwall |
|
6"- 8" diam cargo pipelines
and all product delivery pipelines |
|
R.C. office, structural steel warehouse,
lorry filling shed, drum filling shed, fire pump shed, switch room &
w/shop |
|
Fire fighting system |
|
Electrical and instrumentation system |
|
Fencing, roadwork and general
landscaping |
|
|
The
fabrication, erection, testing and commissioning of aboveground process
piping and mechanical process equipment installation for Naptha Cracking
Plant (230,000 MTPY) for Titan Petrochemicals (M) Sdn Bhd., Johore, Malaysia |
|
Major work quantities : |
|
Prefabrication and erection of 150,000
diam-inch of pipework (Piping material : A53GrB, A333 GrB, A312-TP304,
A312-TP316, A335GrP11,A333Gr3) |
|
Hydrotest (150 test packages) |
|
Pre-commissioning assistance |
|
|
The procurement and
installation of all carbon steel, stainless steel copper and aluminium piping
work, equipment installation, painting, cold and hot insulation for MOX Pasir
Gudang Air Separation Plant for Malaysia Oxygen Berhad, Malaysia |
|
|
The engineering, procurement
and installation of hydrogen and nitrogen gas distribution pipeline from
Malaysia Oxygen Bhd Plant to Pasir Gudang Industrial Estate for Malaysian
Oxygen Berhad. |
|
Hydrogen Pipeline : 6"
x 1.8 Km |
|
Nitrogen Pipeline : 8"
x 3.2 Km |
|
Road Boring : 600 mm Diam x
12 length (5 locations) |
|
|
The upgrading work for the
high and low flare system for Terengganu Crude Oil Terminal, (Emergency shut
down work) for Esso Production (M) Inc., Kerteh, Malaysia. |
|
|
The
installation of all carbon, alloyed and stainless steel piping, erection of
process equipment insulation and painting works for the Kuantan Gas
Compressor and Paka Metering Station, for Petronas Gas Sdn Bhd, Malaysia |
|
Major work quantities : |
|
Equipment installation Total weight = 504 MT |
|
Mechanical piping installation (Total = 60,000 diam-inch) |
|
Insulation for Gas Piping System : 1,200
m2 |
|
|
To
supply labour , equipment, materials and consumables for the fabrication,
installation, testing and commissioning of the mechanical and electrical
works for the Esso Onshore Slugcatcher Facilities, Malaysia. |
|
Fabrication & installation of
slugcatcher fingers consisting of 10 tubes of 42 inch dia. x 50.8mm thick x
1,200 ft long pipe. |
|
Fabrication & installation of 1 no.
28 inch dia. and 1 No.8 inch dia. Condensate pipelines from Beach tie-in to
slugcatcher site 9200mm each. |
|
Flare system & flare stack |
|
Firewater piping system & firewater
tank (916m dia. x 7.5m H) |
|
Carbon/stainless/alloyed
steel/process/utility piping |
|
Installation of Gas scrubbers (174t)
Condensate separators (106T) Condensate coalescer (20T) Flare scrubbers (27T)
and others. |
|
Uninterrupted power supply system. |
|
Gaitronics communications system. |
|
Electrical grounding grid for all tank
& steel structure |
|
Lighting & receptacle system. |
|
Custody gas metering system. |
|
Pre-commissioning of mechanical,
electrical and instrumentation systems. |
|
Commissioning assistance |
|
|
The engineering,
procurement, construction and commissioning of piperack structure for
equipment unit 266 / 024 silo. |
|
|
The
engineering, procurement, construction and commissioning of 1 unit of 3500mm
dia. X 83200mmH steel silo inclusive of steel supporting structures. |
|
|
The
Engineering, procurement, construction and commissioning of 4 units of 6756mm
dia. X 15230mmH steel silo inclusive of steel supporting structures. |
|
|
The construction, testing
and commissioning of all civil, mechanical, piping, electrical and
instrumentation work for the Natural Gas Metering & Supply System for
Stage I & III Boiler Gas Conversion project at Senoko Power Station
Singapore |
|
|
The engineering,
procurement, construction and testing of 300mm dia. X 3.2 km carbon steel sch
60 and 300mm dia. Acid pipeline from Kemaman Supply Base to Tioxide Sulphuric
Acid Handling Facilities at Telok Kalong Industrial Estate for Tioxide Group
Service |
|
|
The
installation of refractory work for 4 units of UCS cracking furnance for
Naptha Cracking Plant, Pasir Gudang, Johore |
|
|
The engineering,
procurement, erection, painting, testing and commissioning of the complete
mechanical, piping electrical and instrumentation work for Condensate Storage
and Handling facilities (Onshore Slugcatcher) for Esso Production (M) Inc.,
Malaysia. |
|
Major work quantities : |
|
Structural steel pipe rack fabrication
and erection |
|
Piping spool pre-fabrication and
erection |
|
Piping, equipment installation,
electrical and instrumentation work
for gas metering skid |
|
Condensate pump installation and testing |
|
Electrical grounding grid for all steel
structue |
|
Programme logic controller (PLC) to
control all shutdown system (Tie-in to the existing modicon system) |
|
Gaitronic communication system for audio
communication at new plant area |
|
Distributed control system (DCS) to
provide operating details for new plant facilities in the existing system and
allow control from the console located in the main control room |
|
Lighting and receptable system for all
new facilities and 240V |
|
Hydrostatic tank gauging system |
|
Fibre optic detection system for tank
farm |
|
|
The engineering,
procurement, construction, testing and maintenance of three nos. of vertical
storage tanks (2 nos. 29.3m dia. / 14.6mH and 1 no. 17.1m dia. X 14mh) c/w
foundation, fire fighting facilities and associated piping and electrical
work at Petr |
|
|
The installation of all u/g
pipes, incl. pipe trench excavation, backfilling, anti corrosion wrapping and
hydrotesting at Gas Processing Plant Expansion Project, Kerteh, Terengganu |
|
|
Procurement, construction
and commissioning of storage tank for JET A1 at PDSB's aviation fuel farm at
Subang International Airport. |
|
|
The
construction of main office warehouse, lorry filing shed, drum filling shed
drains, fencing, road work and general earthwork for the proposed Shell Tawau
Complex. |
|
|
The construction and
completion of proposed site office extension, warehouse and workshop for
Henkel Oleochemicals (M) Sdn Bhd, Banting , Malaysia. |
|
|
The civil / building and
structural construction of the proposed hydrogen Plant at Pasir Gudang Johore
Darul Takzim for M.O.X Berhad |
|
|
Site cleaning, general
earthwork, internal road, temporary and permanent drain, fencing, road
crossing and other civil works for Phase II Onshore Slugcatcher Facilities
for Esso Production (M) Inc., Malaysia. |
|
Major scope of work : |
|
Area
: 220 acres (900,000 m3) |
|
Excavation : 150,000 m3 |
|
Filling
: 1,000,000 m3 |
|
Drainage : 7,000 m (900 mm to 3600 mm W) |
|
Concrete : 30,000 m3 |
|
Fencing
: 4,000 m |
|
Road Pavement : 4,500 (4m width) ;
1,600 m (6m width) |
|
Gabion/Mattress/Geotextile : 20,000 m2 |
|
Turfing
: 300,000 m2 |
|
|
The
engineering, procurement, erection of 9 nos. of internally lined and unlined
cone roof storage tanks for Tioxide Chemicals Plant at Kemaman, Terengganu |
|
|
Proposed tank farm &
gantry at Telok Panglima Garang, Banting, Selangor for Henkel Oleochemicals
(M) Sdn Bhd |
|
|
Installation of Menthor - 26
Storage Tank and associated piping works for EMB at Kemaman Petroleum Supply
Base. |
|
|
Prefabrication
and installation of 3" to 48" pipe spools and piping system on
elevated piperack to tie-in to new floating roof tank T-446, including all
electrical and instrumentation work at Terengganu Crude Oil Terminal, Kerteh.
(All materials supplied |
|
|
Construction
of 1 no 15m dia. x 14mH fire water tank, pump house and associated piping
work for Shell Tawau Depot, Sabah |
|
|
The construction of 3 nos.
35' dia. x 30'H M.S. Storage tank at Dovechem Terminals Kuantan. |
|
|
The engineering, procurement
and installation of 6" dia. & 4" dia. Oxygen / Nitrogen
pipeline from MOX Plant to ASM, UNICHEMA and Bradford Plants at Bukit Raja
Industrial Estate, Shah Alam, for Malaysia Oxygen Berhad, Malaysia. |
|
|
Site clearing, earthwork,
concrete / timber piling, main office building, LLN sub-station, piperack
structure, machinery foundation, road pavement, drainage, turfing, fencing
and associated works for an Air Separation Plant for Malaysia Oxygen Berhad,
Buk |
|
|
Site clearing, earthwork,
steel structure for LPG Bottling Plant Hall, LLN Sub-station, Gas Compressor
Shed, drainage, roadwork, fencing and associated work for LPG Storage cum
Bottling Plant for Shell Malaysia Trading Sdn Bhd, Pasir Gudang, Malaysia. |
|
|
The construction of roads
and drain and buildings for Compressor Booster Station at Terengganu Crude
Oil Terminal for Esso Production (M) Inc., Kertih, Malaysia. |
|
|
The construction of the
proposed 2 - storey Laboratory building c/w timber piling works at Jalan
Banting, Selangor |
|
|
The construction of the
proposed rebuilding Esso Service Station on Lot T.L.O 41111 at Jalan Harimau
/ Jalan Harimau Tarum, Taman Century, Johore |
|
|
The procurement, erection,
design and commissioning of 1 x 50' dia. X 36'H storage tank at Esso Kuching
Terminal, Sarawak |
|
|
The design, construction and
commissioning of Sodium Acid Metaphosphate Plant |
|
|
The construction of 9 nos.
of bulk storage tanks and all associated piping works, including 1.6 km three
10-inch cargo lines from the Jetty for Shell Pasir Gudang Depot, for Shell
Malaysia Trading Sdn Bhd, Malaysia. |
|
|
Proposed Shell Services
Station at P.T. 241, Wangsa Maju, Setapak, Wilayah Persekutuan |
|
|
The construction, completion
and maintenance of roads, drains, petroleum products tank foundation and
associated works for Shell Depot (Phase 1) C67for Shell Malaysia Trading Sdn
Bhd, Bintulu, Malaysia. |
|
|
The
construction of laboratory and office
ext. building, new packaging supervisor room and fire rated brickwall
and associated works. |
|
|
Installation of Heating
Facilities for Storage of Residual Fuel Oil at Esso Bagan Luar Terminal. |
|
|
The
construction of Shell Service Station at Taman Sri Muda, Shah Alam,
Selangor |
|
|
Proposed Shell Service
Station on Lot T.L. 77, Jalan Apin-Apin, Keningau, Sabah |
|
|
Supply, delivery,
installation, testing and commissioning of first manholes, sewer pipe and
installation for Hostel III, IV, V at University Technology of Malaysia,
Skudai, Johore |
|
|
Construction
of new warehouse, roadwork, fencing and associated works |
|
|
Improvement to roadwork,
fencing tank farm, catwalk / platform for Shell Depot at Keningau, Sabah |
|
|